Contamulte

Tyres

In the navigation for the demand it carries, not for rows we can show today.

What a row contains

Each row carries the corridor the article sets, the sum actually due — the floor of that corridor, under art. 202 — the points deduction and any accessory sanctions, with the article beside it. Where the statute sets no maximum for that row, the column stays empty rather than holding a figure that does not exist.

Full table

No rows to show, and why

This category is in the navigation because the demand exists and is measured. The texts we have extracted so far contain no usable rows for it: we would rather say so than fill the table with figures taken from elsewhere. They will arrive with the next extraction.

What we found

The amounts are bounded by a decree that is due

Change pending

The decree is due by 1 December 2026 and takes effect on 1 January 2027, indexed to the ISTAT variation for the 2025-2026 two-year period. We predict no figure: the index cannot be ascertained until the period closes, the decree does not exist, and the mechanism's suspension has already been extended several times. A predicted figure here would be an invention.

Art. 195 co. 3 CdS; L. 197/2022 art. 1 co. 497, as amended by D.L. 31 December 2025 no. 200 art. 9 co. 1

Draft in progress: the long-form text of this page is still being written.

Next step

Start from the number on your notice

The calculator shows the art. 345 reduction step by step, then the band, then the payable figure and the deadlines.

PREVIEW — a preview of the site, not an official document