The four art. 142 bands
The bands are read on the km/h over the limit calculated AFTER the art. 345 reduction — the same table the calculator uses, with the same figures.
← Scroll the table →
| Band | Payable | Corridor | Points | Suspension | Consequences |
|---|---|---|---|---|---|
| 0 km/h – 10 km/h | € 42 | from € 42 to € 173 | — | — | Financial penalty only· Grade I |
| 10 km/h – 40 km/h | € 173 | from € 173 to € 694 | 3 | — | Penalty and points· Grade II |
| 40 km/h – 60 km/h | € 543 | from € 543 to € 2.170 | 6 | 1–3 months | Penalty, points and suspension· Grade III |
| > 60 km/h | € 845 | from € 845 to € 3.382 | 10 | 6–12 months | Long suspension· Grade IV |
- In force as of
- 1 January 2021
- Source
- CdS art. 142
Fine catalogue
The catalogue row for this category
A different cut of the same statute: one named offence, with its article, its accessory sanctions and its source. Its consequences are read on the same scale as the table above.
← Scroll the table →
| Offence | Minimum | Maximum | Points | Suspension | Consequences |
|---|---|---|---|---|---|
| € 42 | € 173 | — | — | Financial penalty only· Grade I | |
| € 173 | € 694 | 3 points | — | Penalty and points· Grade II | |
| Exceeding the limit by more than 40 and not more than 60 km/h | € 543 | € 2.170 | 6 points | 1–3 months | Penalty, points and suspension· Grade III |
| € 845 | € 3.382 | 10 points | 6–12 months | Long suspension· Grade IV |
- In force as of
- 1 January 2021
- Source
- CdS art. 142
What we found
The amounts are bounded by a decree that is due
Change pending
Art. 195 co. 3 CdS; L. 197/2022 art. 1 co. 497, as amended by D.L. 31 December 2025 no. 200 art. 9 co. 1
Finding your row
How to read the speeding-fine table
This table is CdS art. 142's scale, in 4 bands, and every band is read off one quantity: km/h OVER the limit — not the recorded speed, not the limit, the difference between them, and only after the art. 345 reduction has been taken. A reader who looks for their row starting from the large number printed on the notice almost always lands one band above the one they were actually charged under.
Each row carries four separate things and they are worth keeping apart. The corridor is the statutory range between a minimum and a maximum. The amount payable is the reduced-payment figure — the one that closes the matter now. The points come from the table annexed to art. 126-bis, which is a different source from the article itself. The suspension, where there is one, is an accessory penalty and not a surcharge.
The bands run from up to 10 km/h over the limit, where the amount payable is € 42 and no points are deducted, up to more than 60 km/h over the limit, where the amount payable is € 845, the deduction is 10 points and the suspension is 6 months. The step that matters most sits between them: more than 40 and not more than 60 km/h over the limit is the first band that reaches the licence, with a suspension of 1 month.
How it works
The reduction is applied before the band is chosen
The order of operations decides the row, and the row decides everything else. The art. 345 co. 2 reduction — 5% of the recorded value, with a floor of 5 km/h — comes off first, and only the result is compared with the limit. Up to 100 km/h the flat floor is the more favourable of the two; above it, the percentage is.
This is why two drivers stopped at the same recorded speed on different limits can end up in different bands, and why an excess that looks small can fall below the first band and produce no speeding penalty at all. This site's calculator applies exactly that sequence, on exactly these figures.
One qualification about the measuring method, because it changes the rule and not merely the device: co. 3 of the same art. 345 sets a distinct regime for average speed computed between two points, with percentages of its own. That regime is not modelled in our calculation — a statement about our tool, not an observation about the statute.
The corridor and the amount payable are not two prices in disagreement
CdS art. 142 · art. 202 · D.P.R. 495/1992 art. 345
Draft in progress: the long-form text of this page is still being written.
Next step
Start from the number on your notice
The calculator shows the art. 345 reduction step by step, then the band, then the payable figure and the deadlines.